Concrete Road Installation Quotes

Get Professional Services

Cost of Concrete Road Installation in Greenville

Concrete road installation in Greenville, NC, is a significant investment that can provide long-lasting durability and a smooth driving surface. Understanding the various factors that influence the cost can help residents and businesses budget effectively for such a project. This guide breaks down the key elements affecting the cost and provides an overview of common tasks and their average costs in Greenville.

Factors Affecting Cost

  • Material Quality: Higher-grade concrete and additional reinforcements can increase costs.
  • Labor Rates: Local labor rates in Greenville can vary depending on the contractor's experience and demand.
  • Road Size and Thickness: Larger and thicker roads require more materials and labor.
  • Site Preparation: The condition of the existing site and the need for excavation or grading can affect the cost.
  • Permits and Inspections: Fees for local permits and required inspections can add to the overall expense.
  • Weather Conditions: Seasonal weather in Greenville can impact project timelines and costs.
  • Accessibility: The ease of access to the site can influence transportation and labor costs.

Average Costs for

Task Average Cost (Greenville, NC)
Basic Concrete Road (per sq. ft.) $6 - $10
High-Grade Concrete (per sq. ft.) $10 - $15
Site Preparation (per hour) $50 - $75
Excavation (per cubic yard) $30 - $50
Reinforcement (per sq. ft.) $2 - $3
Permits and Inspections $500 - $1,000
Labor (per hour) $40 - $60

Concrete Road Installation